Jon Courville

Time to go green, spring.🍃 #vscocam + #mextures + #afterlight
Apr 1

Time to go green, spring.🍃 #vscocam + #mextures + #afterlight

| S U N S E T | #coloradogram #vscogrid #mexturesapp #chasingsunsets
Feb 7

| S U N S E T | #coloradogram #vscogrid #mexturesapp #chasingsunsets

Ecc 3:11 “He hath made every thing beautiful in his time” collab with @bethiefaith (my pic her hand drawn art) #christfollowers
Jan 25

Ecc 3:11 “He hath made every thing beautiful in his time” collab with @bethiefaith (my pic her hand drawn art) #christfollowers

The Miniatures Series. Process: Go to Belmont Abbey North Carolina, take pictures + take another pic and make it tiny in #pstouch -  @eetomblin #miniatures
Jun 7

The Miniatures Series. Process: Go to Belmont Abbey North Carolina, take pictures + take another pic and make it tiny in #pstouch - @eetomblin #miniatures

Shot this in the car yesterday. #5Dmk2    -      Facts 

Overview
Cantilevered through truss bridge over the Mississippi River on U. S. Highway 60 / 62 between Birds Point, MO, and Cairo, IL
Location
Cairo, Alexander County, Illinois, and Mississippi County, Missouri
Status
Open to traffic
History
Built 1929; tolls removed 1954; rehabilitated 1983, 2005, and 2011
Builders
- American Bridge Co. of New York (Superstructure)
- Missouri Valley Bridge & Iron Co. of Leavenworth, Kansas (Substructure)
- Waddell & Hardesty (Consulting Engineer)
Design
Cantilevered Warren through truss
Dimensions
Length of largest span: 700.9 ft.
Total length: 5,175.5 ft. (1.0 mi.)
May 29

Shot this in the car yesterday. #5Dmk2 - Facts 

Overview
Cantilevered through truss bridge over the Mississippi River on U. S. Highway 60 / 62 between Birds Point, MO, and Cairo, IL
Location
Cairo, Alexander County, Illinois, and Mississippi County, Missouri
Status
Open to traffic
History
Built 1929; tolls removed 1954; rehabilitated 1983, 2005, and 2011
Builders
- American Bridge Co. of New York (Superstructure)
- Missouri Valley Bridge & Iron Co. of Leavenworth, Kansas (Substructure)
- Waddell & Hardesty (Consulting Engineer)
Design
Cantilevered Warren through truss
Dimensions
Length of largest span: 700.9 ft.
Total length: 5,175.5 ft. (1.0 mi.)

I found a tree. #thatonetree #igersmissouri
May 28

I found a tree. #thatonetree #igersmissouri

Brother Sister jump! Had the pleasure to do a senior session for my friend Peter last weekend, and his sis joined in on this fun shot! @the_cello_guy @afcal #jumpstagram #16x9fordays
May 20

Brother Sister jump! Had the pleasure to do a senior session for my friend Peter last weekend, and his sis joined in on this fun shot! @the_cello_guy @afcal #jumpstagram #16x9fordays

Into the joy and light of Thy home,
Jesus, I come to Thee. Process: #getupearly + #snapseed + #pstouch + #ndpatterns - #16x9fordays #fromwhereikayak #muchlatergram
May 19

Into the joy and light of Thy home,
Jesus, I come to Thee. Process: #getupearly + #snapseed + #pstouch + #ndpatterns - #16x9fordays #fromwhereikayak #muchlatergram